Category
Build the Finish

1) Build the Finish

At the end of the frame (rough part), it is considered that 70% of the house has been built, the remaining 30% is the completion stage, although it is lighter but requires more technical and aesthetic aspects.

The completion stage includes the following stages: foundation lamination, foundation slatting, tile tiling, wall painting, installation of electrical engineering system, water supply and drainage,...

The stage of rolling and screed is the stage of spreading a layer of screed on the surface of the base of bricks, concrete of all kinds or reinforced concrete. Before polishing, the structure of the foundation must be stabilized and the surface of the foundation must be flat, free of dust, bucket marks must be carefully inspected, scrubbed of oil stains and moss,..

1. Next is the tiling stage: the tiling must be in accordance with the manufacturer's prescribed standards. The brick circuit needs to be even, the bricks are straight, not staggered, tilted. There are many different types of tiles on the market.

2. Normally, there are 2 common types of tiles as follows: Ceramic tiles are low priced, have poor durability, may fade or the enamel peels off over time. Pressed stone powder bricks have a higher price, better quality, and color durability. In addition, the homeowner can also replace it with wood or imitation wood cement

The wall painting stage is an important stage to ensure the aesthetics and high durability of the project. Currently, there are many different types and brands of decorative paints on the market, in terms of solvent, they can be divided into two types: water-based paints and oil-based paints.

1.Water-based paint is often used to paint walls because the paint film allows a certain amount of moisture in the wall to escape without causing blisters and deformation of the wall patch.

2. Oil-based paints are mainly used for wood and metal surfaces. In addition, in terms of functionality, when used to paint indoors, it has the characteristics of easy to clean, smooth and aesthetic surfaces, and is also used for outdoor paint with waterproof, anti-moss, dust-resistant and color-fast.

The installation stage of electricity, water and technical systems such as water tanks, toilets, air conditioners, electric bulbs, etc. need to be implemented in accordance with technical drawings and at the same time ensure the current standard system. It is important to be safe and economical, suitable for the needs of the family.

Note: The electrical and water installation stage must be carried out in parallel during the construction of the rough part and the finished part.

Currently, most of the electricity and water are installed in the wall, so you should choose branded and reputable products to use. It is not recommended to choose products that float in the market. As for the interior installation stage, it is necessary to determine the furniture that suits the needs, preferences, and investment level of the family, it is best to have the participation of a consultant architect from the beginning to choose beautiful, quality and harmonious furniture with the overall house.